October 15, 2026

Sharing is caring!

The Federal Government has announced the temporary closure of the First Niger Bridge in Onitsha, Anambra State, for urgent repairs and maintenance.

The bridge will be completely shut to traffic from Monday, September 7, to Monday, September 21, 2026, to allow contractors carry out emergency works on deteriorated sections of the bridge.

The Federal Ministry of Works said the intervention became necessary following an inspection by the Minister of Works, David Umahi, during his recent working visit to Anambra State.

According to the ministry, parts of the bridge’s road surface and structural components have deteriorated, while some nuts, bolts, expansion-joint steelworks and other components were allegedly removed by scavengers.

The Anambra State Field Headquarters of the ministry disclosed this in a statement signed by the State Controller, Timothy Emenike.

The ministry said SKECC, the contractor handling the 20-kilometre section of the Onitsha-Enugu Dual Carriageway, has been directed to commence the emergency repairs immediately.

The work will include removing the damaged asphalt and replacing it with about 40 millimetres of new asphalt wearing course, alongside other maintenance and safety measures.

The Federal Government also plans to install solar-powered streetlights and CCTV cameras on the bridge to improve visibility and security and help prevent further theft of bridge components.

During the closure, motorists have been advised to use alternative routes, particularly the Second Niger Bridge through Obosi towards Asaba in Delta State and other destinations.

Motorists have also been urged to obey temporary road signs and diversion instructions, reduce speed around construction areas and avoid reckless overtaking.

The ministry said traffic-control personnel, safety barriers and other safety measures would be deployed to guide motorists and protect road users and construction workers.

It added that repair works would continue during the day and night to ensure completion within the scheduled two-week closure period.

While acknowledging that the closure may cause inconvenience to motorists, businesses and residents, the ministry said the intervention was necessary to prevent further deterioration and safeguard lives.

The Federal Government appealed for public understanding and cooperation, stressing that the repairs are aimed at restoring the First Niger Bridge to a safe and motorable condition and ensuring smoother movement of people and goods along the Onitsha-Enugu corridor.

Sharing is caring!

Leave a Reply

Your email address will not be published. Required fields are marked *